Product overview
CLT Type Magnetic Desliming Tank
CLT Type Magnetic Desliming Tank is presented as a magnetic separator for mineral processing option for mineral processing and ore recovery. Its final configuration should be based on the actual material, process position, operating conditions and the technical information available for the requested project. COWIN MAGNET supplies this high-gradient or specialist mineral magnetic separator for South African and African projects where the equipment must be matched to the real process rather than selected from a name alone. The review starts with the material stream, installation position, available space and operating environment. Final configuration, commercial availability and any numerical performance data are confirmed by COWIN engineering and the supplier for the requested project.
How it works
How it works
The diagram is a planning aid. Final positioning is confirmed from the line layout and the material duty.
- 01Prepared mineral feed
- 02Specialist magnetic zone
- 03Target fraction
- 04Residual stream
- 05Process review
- 01 Prepared feed
- 02 Magnetic separation stage
- 03 Magnetic product stream
- 04 Non-magnetic or tailings stream
- 05 Downstream recovery or processing
Product features
Key features
Features shown here come from the current COWIN product record and are confirmed again for the requested configuration.
- Process position before model
- Feed condition controls the design
- Target stream is defined
- Testing may be required
- Dry or wet process position, where applicable
- Feed arrangement and product discharge direction
- Magnetic circuit or intensity class confirmed by material
Process fit
Typical applications
COWIN MAGNET supports South African and African projects. These applications describe relevant process contexts, not local installations or inventory.
- Mineral beneficiation projects with a defined magnetic-separation stage
- Chrome, manganese, iron-bearing or other mineral streams subject to testwork
- Tailings, recovery or upgrading reviews
- Process lines where feed condition and target mineral response are confirmed
Process objective
What it helps solve
Final outcomes depend on material, installation and the confirmed model.
- Helps define a specialist magnetic separation stage in a mineral process
- Supports review of target mineral response before equipment selection
- Keeps recovery or grade expectations dependent on representative process evidence
Engineering inputs
Installation and selection guide
Provide the following information so COWIN can review the product against the actual process.
- Mineral composition, objective and representative sample data
- Particle-size distribution and dry or slurry feed condition
- Target magnetic fraction and downstream process route
- Water, slurry, power and installation constraints where applicable
- Laboratory, pilot or plant test information where available
Confirmed data
Technical specifications
Only verified public fields are shown as values. Other fields remain subject to project confirmation.
Configuration
Options and customisation
Only options appropriate to the selected product and project are confirmed in a quotation.
- Dry or wet process position, where applicable
- Feed arrangement and product discharge direction
- Magnetic circuit or intensity class confirmed by material
- Wear, water and slurry handling details reviewed for the site
Service planning
Operation and maintenance
Use site-safe isolation and the supplier-approved procedures for the selected configuration.
- Isolate power, feed and moving equipment before inspection.
- Inspect the selected separation zone, feed arrangement and discharge areas.
- Use the supplier-approved maintenance plan once the final configuration is confirmed.
Product FAQ
Questions buyers ask
Answers apply to this product family and do not replace a project-specific engineering review.
Selection begins with the mineral, particle size, feed condition, desired magnetic and non-magnetic product streams, throughput and the place of the machine in the process flow.
No. Magnetic response, liberation, feed preparation and separation target vary by material. A dry, wet, high-gradient or drum configuration is selected for the actual duty.
Provide mineral name, feed size, moisture or slurry condition, throughput, process sketch, desired product streams and any available test or plant data.
No. Recovery depends on the material and process. Results should only be discussed after the feed and operating conditions are reviewed.
Project inquiry
Request a project-specific review
Share the operating details below. The product, source URL, UTM values and page language travel with this inquiry.




